Crosby Arboretum Collection
Collection
Identifier: University Archives-A2006-4
Dates
- Existence: 1922 - 2011
Extent
21 Cubic Feet : Correspondence, Maps, Brochures, Blueprints, Financial Documents (Receipts and Deposits)
Language of Materials
English
76-100, Drawer 1, Folder 1, Nicholson Quadrangle Topographic Map, 1976
81-100, Drawer 1, Folder 2, Immediate Vicinity Context Map–Ed Blake, Aug. 1981
81-131, Drawer 1, Folder 2, Development Concept Diagram–Ed Blake, 1981
81-132, Drawer 1, Folder 2, Crosby Arboretum Concept Map–Ed Blake, 1981
81-133, Drawer 1, Folder 2, Plant Grid Map–Ed Blake
81-135, Drawer 1, Folder 2, Picayune, MS. Topographic Map–Ed Blake, 1981
81-200, Drawer 1, Folder 2, Picayune Context Map–Ed Blake, Aug. 1981
81-230, Drawer 1, Folder 2, Crosby Arboretum Concept Map-Ed Blake
81-300, Drawer 1, Folder 2, Regional Context Map–Ed Blake, 1981
81-300 A, Drawer 1, Folder 2, Statistical Plot-Dr. McDaniel’s Vegetation Inventory; Babbitt, 1981
81-300 B, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 C, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 D, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 E, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 F, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 G, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-301, Drawer 1, Folder 2, Pearl River Basin Context Map–Ed Blake, 1981
81-302, Drawer 1, Folder 2, Pearl River Basin Context Map-Base Map Original–Ed Blake, Aug. 1981
81-400, Drawer 1, Folder 2, Sunbelt Context Map–Ed Blake, Aug. 1981
81-901, Drawer 1, Folder 2, Design Program Task Flow-Meeting with Mrs. Gammill–Ed Blake, 2/14/1981
81-902, Drawer 1, Folder 2, Research and Consoli-Date Background Information–Ed Blake, 1981
81-903, Drawer 1, Folder 2, Meeting with Arboretum Foundation Board–Ed Blake, March 14, 1981
81-904, Drawer 1, Folder 2, Gather Facts to Substantiate Philosophy, Purpose, Goals and Objectives–Ed Blake, 1981
81-905, Drawer 1, Folder 2, May 16th Meeting with Arboretum Foundation Board–Ed Blake, 1981
81-906, Drawer 1, Folder 2, Design Program Phase–Ed Blake, 1981
81-907, Drawer 1, Folder 2, Design Plan Phase–Ed Blake, 1981
82-1, Drawer 1, Folder 3, Topographical Survey-Work Print for Digitizing Pinecote Site Plan at Cabsis Lab, LSU–Ed Blake
82-2, Drawer 1, Folder 3, Crosby Arboretum Concept Diagram-Ed Blake, 1982
82-310, Drawer 1, Folder 3, Drainage Survey for Service–Ed Blake, Oct. 1984
82-332, Drawer 1, Folder 3, Existing Site Features, July 1983
83-135, Drawer 1, Folder 4, Screened Mylar Base Map From Original Topographic Survey–Ed Blake, 1983
83-136, Drawer 1, Folder 4, Southeast Corner Field Notes–Tom Babbitt, Fall 1983
83-139, Drawer 1, Folder 4, Savanna Spatial Structure and Crown Cover–Ed Blake, Sept. 1983
83-140, Drawer 1, Folder 4, Fire, Water, Plant Response Patterns–Ed Blake, Sept. 1983
83-145, Drawer 1, Folder 4, Schematic Master Plan of the Crosby Arboretum, Nov. 1983
83-149, Drawer 1, Folder 4, Proposed Circulation
83-151, Drawer 1, Folder 4, Schematic Master Plan of the Crosby Arboretum, Nov. 1983
83-157, Drawer 1, Folder 4, Schematic Master Plan of the Crosby Arboretum-Proposed Path Loop System
83-158, Drawer 1, Folder 4, Schematic Master Plan of the Crosby Arboretum-Wet Flat Pine Savannah, Winter 1984
83-164, Drawer 1, Folder 4, Pinecote Woodland Management–Chris Wells, Fall 1984
83-165, Drawer 1, Folder 4, Sepia Duplicate of Screened Mylar Base–Ed Blake, 1983
83-166, Drawer 1, Folder 4, Sepia Duplicate of Screened Mylar Base–Ed Blake, 1983
83-167, Drawer 1, Folder 4, Screened Mylar Topo Duplicate with Interstate Border–Tom Babbitt, 1983
83-169, Drawer 1, Folder 4, Plot of Sidney McDaniel’s Statistical Vegetation Analysis Indicating Wetness and Dryness–Tom Babbitt, Fall 1983
83-172, Drawer 1, Folder 4, Existing Tree Locations–Tom Babbitt, Aug. 1983
83-174, Drawer 1, Folder 4, Burned / Unburned-Wet Dry Patterns–Ed Blake, Spring 1983
83-175, Drawer 1, Folder 4, Field Notes Following Rains, Sept. 1983
83-176, Drawer 1, Folder 4, Idea Sheet, July 1983
83-177, Drawer 1, Folder 4, Soil Samples Taken by Chris Wells, Summer 1993
83-178, Drawer 1, Folder 5, Field Notes-Ed Blake, July 1983
83-179, Drawer 1, Folder 5, Field Notes-Tom Babbitt, July 1983
83-180, Drawer 1, Folder 5, Field Notes for Locating Service Road, Summer 1984
83-327, Drawer 1, Folder 5, Idea Sheet #2-Pitcher Plant Meadow Edge Treatment / Sculpture Garden / Entrance / Poplar, Sept. 1983
83-237 A, Drawer 1, Folder 5, Schematic Site Study-Path Loops / Design Structures, 1984
83-237 B, Drawer 1, Folder 5, Schematic Habitat Diagrams-Existing Vegetation Complexes-Andropogon Associates and Ed Blake
83-237 C, Drawer 1, Folder 5, Pinecote Schematic Circulation–Andropogon Associates and Ed Blake, 1984
83-237 D, Drawer 1, Folder 5, Pinecote Schematic Moisture Diagram—Andropogon Associates and Ed Blake, 1994
83-237 E, Drawer 1, Folder 5, Water Circulation Diagram-Piney Woods Lake—Andropogon Associates and Ed Blake, 1983
83-237 F, Drawer 1, Folder 5, Pond Configuration and Proposed Habitats—Andropogon Associates and Ed Blake, 1983
83-237 G, Drawer 1, Folder 5, Pond Journey Concepts-Piney Woods Lake—Andropogon Associates and Ed Blake, 1983
83-237 H, Drawer 1, Folder 5, Schematic Contouring Plan-Piney Woods Lake—Andropogon Associates and Ed Blake, 1983
83-237 I, Drawer 1, Folder 5, Diagrammatic Design-Piney Woods Lake—Andropogon Associates and Ed Blake, 1983
83-328, Drawer 1, Folder 5, Tree Canopy-Tom Babbitt, July 1983
83-329, Drawer 1, Folder 5, Pitcher Plant Meadow Edge Treatment/Sculpture Garden/Entrance/Poplars
83-330, Drawer 1, Folder 5, Tree Canopy Survey-Tom Babbitt, Summer 1983
83-377 A, Drawer 1, Folder 5, Planting Plan
83-377 B, Drawer 1, Folder 5, Layout Plan
83-377 C, Drawer 1, Folder 5, Grading Plan
83-377 D, Drawer 1, Folder 5, Construction Details
83-377 E, Drawer 1, Folder 5, Construction Details
84-1, Drawer 2, Folder 1, Existing Site Habitat
84-46, Drawer 2, Folder 1, Crosby Arboretum Visitor Center-Pavilion Plan-Picayune, MS-Faye Jones and Associates Architects
84-47, Drawer 2, Folder 1, Crosby Arboretum Visitor Center-Pavilion-Picayune, MS-Faye Jones and Associates Architects
84-123 ,Drawer 2, Folder 1, Crosby Arboretum Visitor Center- Picayune, MS-Faye Jones and Associates Architects
84-213, Drawer 2, Folder 1, Pinecote Ridge Road Parking-Ed Blake, Jan. 1987
84-227, Drawer 2, Folder 1, First Trail Loop Features, Feb. 1984
84-251 A, Drawer 2, Folder 1, Transverse Alignment Service Road Layout-Piney Woods Lake-Ed Blake, Sept. 1984
84-251 B, Drawer 2, Folder 1, Service Geometrics Service Road Layout-Ed Blake, Sept. 1984
84-251 C, Drawer 2, Folder 1, Curve No. 1 Service Road Layout-Ed Blake, Sept. 1984
84-251 D, Drawer 2, Folder 1, Curve No. 2 Service Road Layout-Ed Blake, Sept. 1984
84-251 E, Drawer 2, Folder 1, Curve No. 3 Service Road Layout-Ed Blake, Sept. 1984
84-251 F, Drawer 2, Folder 1, Curve No. 4 Service Road Layout-Ed Blake, Sept. 1984
84-251 G, Drawer 2, Folder 1, Road Stationing Service Road Layout-Ed Blake, Sept. 1984
84-269, Drawer 2, Folder 1, Site Study of Original Pavilion and Visitor Center Alignment-Ed Blake, Fall 1984
84-270, Drawer 2, Folder 1, Layout Draft Base Map for Pavilion and Visitor Center-Ed Blake, Fall 1984
84-271, Drawer 2, Folder 1, Field Survey of Slough Trees / Sheet W-6-Ed Blake and Chris Wells, Summer 1985
84-298, Drawer 2, Folder 1, Engineering Drawing of Weir Piney Woods Lake at Pinecote Shows and Dearman, Engineres, 1985
84-301 A, Drawer 2, Folder 1, Shoreline of Pond at Pinecote-Ed Blake, Summer 1984
84-301 B, Drawer 2, Folder 1, Pathways and Key Features Around Pond-Ed Blake, Summer 1984
84-301 C, Drawer 2, Folder 1, A Simple Diagrammatic Presentation of the Pond Fitting Into the Context of Habitat-Ed Blake, Summer 1984
84-301 D, Drawer 2, Folder 1, Xepox Rellum Duplicate of Piney Woods Lake Design Studies-Ed Blake, Summer 1984
84-301 E, Drawer 2, Folder 1, Pinecote Xepox Relumm Duplicate of Piney Woods Lake Design Studies-Ed Blake, Summer 1984
84-302 A, Drawer 2, Folder 1, Initial Attempts to Establish the Geometry of the Service Rd. Approachign the Pond Inlet-Ed Blake, Fall 1984
84-302 B, Drawer 2, Folder 1, Crosby Arboretum Pond
84-302 C, Drawer 2, Folder 1, Cleaned Map Indicating the Pond Opening Created with Tractor and Mower-Chris Wells, 1984
84-303 A, Drawer 2, Folder 2, Survey of Trees Around the Pond’s Margin, 1984
84-303 B, Drawer 2, Folder 2, Chris Well’s Survey of Tree Locations Adjacent the Slough-Rec’d Tuesday-Ed Blake, 1984
84-303 C, Drawer 2, Folder 2, Survey of Trees Adjacent Pond and Slough-Chris Wells and Ed Blake, Feb. 1985
84-303 D, Drawer 2, Folder 2, Early Attempt at Waiting Out the Alignment of the Annual Journey to Approach the Pavilion-Ed Blake, Fall 1984
84-304, Drawer 2, Folder 2, Survey Reference Geometry for Slough-Ed Blake, 1984
84-305, Drawer 2, Folder 2, Pond and North Shore Siding of Visitor Buildings-Ed Blake, 1984
84-306, Drawer 2, Folder 2, Pond Foreground, Middle Ground, and Background Zones-Ed Blake, 1984
84-307, Drawer 2, Folder 2, Preliminary Contour Sketch of Pond-Ed Blake, 1985
84-308, Drawer 2, Folder 2, Sketch Revision of Pond Bottom to Resemble Old Channel Patterns-Ed Blake, 1985
84-309, Drawer 2, Folder 2, Pond Survey Transverse-Ed Blake, 1984
84-312, Drawer 2, Folder 2, Sheet W-7 Tree Survey-Ed Blake and Chris Wells, July 1985
84-331, Drawer 2, Folder 2, Crosby Arboretum-First Trail Loop, February 1984
84-331 B, Drawer 2, Folder 2, Crosby Arboretum-First Trail Loop with Past Burn Observations-Ed Blake
84-333, Drawer 2, Folder 2, Piney Woods Lake and First Path Loop-Ed Blake, Fall 1984
84-334 A, Drawer 2, Folder 2, Field Layout of Service Road-Ed Blake, October 1984
84-334 B, Drawer 2, Folder 2, Pattern of Dry Ridges-Ed Blake, Fall 1984
84-334 C, Drawer 2, Folder 2, Savannah Firebreak Map-Tom Babbitt, Summer 1983
84-334 D, Drawer 2, Folder 2, Ed’s Field Notes, Summer 1983
84-335 A, Drawer 2, Folder 2, Evolution in Site Design for Pond and Surroundings-Ed Blake, Fall 1984
84-335 B, Drawer 2, Folder 2, Pond Margin Habitat Concepts-Ed Blake, Fall 1984
84-338, Drawer 2, Folder 2, Site Plan of Crosby Arboretum-Ed Blake, Fall 1984
84-339, Drawer 2, Folder 2, Preliminary Site Design-Ed Blake, Fall 1984
84-340, Drawer 2, Folder 2, Proposed Service Road Alignment and Statistics-Ed Blake, Fall 1984
84-401, Drawer 2, Folder 2, Analysis of Drainage Patterns for Service Road and Piney Woods Lake-Chris Wells, 1984
84-403, Drawer 2, Folder 2, Layout of Service Road, Piney Woods Lake, and First Path Loop-Sepia Duplicate of Original-Ed Blake, 1984
84-404, Drawer 2, Folder 2, Layout of Service Road, Piney Woods Lake, and First Path Loop-Sepia Duplicate of Original-Ed Blake, 1984
84-405, Drawer 2, Folder 2, 3 Misplaced East-West Grid Lines R-S, 2-AA, AA-BB-Ed Blake, 1984
85-2, Drawer 2, Folder 3, Site Plan Study for Pavilion Restroom, Aug. 1988
85-12 A, Drawer 2, Folder 3, Piney Woods Lake-The Crosby Arboretum, July 1985
85-12 B, Drawer 2, Folder 3, Piney Woods Lake-The Crosby Arboretum, 1985-86
85-15, Drawer 2, Folder 3, Pond North Shore Revisions-Ed Blake, Fall 1984
85-35, Drawer 2, Folder 3, Crosby Arboretum Visitors Center-Ed Blake Copy, Aug. 1985
85-38, Drawer 2, Folder 3, Crosby Arboretum Visitors Center-Pavilion Plans, Dec. 1985
85-121, Drawer 2, Folder 3, Crosby Arboretum Visitors Center - Weir Design-Ed Blake, Nov. 1985
85-124, Drawer 2, Folder 4, Crosby Arboretum Visitors Center-Pavilion Design (Site Plan, Foundation Plan, Framing Plan, Floor Plan, Roof Plan, Bracing and Grids, Skylights, Metal Connectors), Aug. 1985
85-127, Drawer 2, Folder 4, Crosby Arboretum Visitors Center-Pavilion Revisions (Site Plan, Foundation Plan, Foundation, Framing Plan, Columns and Beams and Grids, Floor Plan, West and East Elevations, Bracing and Grids and South Elevation, Stripping Layout, Brackets and Connectors, Plan of Weir, Electric Specifications, Grate Frame), Nov. 1985
85-128, Drawer 2, Folder 4, Floor Plan-Ed Blake, Dec. 1985
85-128 A, Drawer 2, Folder 4, Spatial Use Diagram-Visitor Pavilion-Ed Blake, July 1985
85-129 A, Drawer 2, Folder 4, Plan for Changing Alignment of Pinecote Pavilion-Ed Blake, 1985
85-205, Drawer 2, Folder 4, Weir Sketch-Piney Woods Lake at Pinecote-Ed Blake, 1985
85-206, Drawer 2, Folder 4, Piney Woods Lake at Pinecote-Elevation Sketch of Weir-Ed Blake, 1985
85-207, Drawer 2, Folder 4, Piney Woods Lake Pinecote-Weir Sketch and Water Draw Down-Ed Blake, 1985
85-233 A, Drawer 2, Folder 4, Crosby Arboretum Lake / North Pond–Earth Work Calculations-52.5 Contour-Ed Blake, Nov. 1984
85-233 B, Drawer 2, Folder 4, Crosby Arboretum Lake / North Pond Earth Work Calculations-52 Contour-Ed Blake, Nov. 1984
85-233 C, Drawer 2, Folder 4, Crosby Arboretum Lake / North Pond Earth Work Calculations-51 Contour-Ed Blake, Nov. 1984
85-233 D, Drawer 2, Folder 4, Crosby Arboretum Lake / North Pond Earth Work Calculations-50 Contour-Ed Blake, Nov. 1984
85-233 E, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations-Ed Blake, Nov. 1984
85-233 F, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations-50 Contour-Ed Blake, Nov. 1984
85-233 G, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations-51 Contour-Ed Blake, Nov. 1984
85-233 H, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations-52 Contour-Ed Blake, Nov. 1984
85-233 I, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations–Ed Blake, Nov. 1984
85-234 A, Drawer 2, Folder 4, Piney Woods Lake Lower Pond Earth Work Calculations-42, 44, 46 Contour Excavation-Ed Blake, Nov. 1984
85-234 B, Drawer 2, Folder 4, Piney Woods Lake Lower Pond Earth Work Calculations-48 Contour Excavation-Ed Blake, Nov. 1984
85-234 C, Drawer 2, Folder 4, Piney Woods Lake Lower Pond Earth Work Calculations-50 Contour Excavation-Ed Blake, Nov. 1984
85-234 D, Drawer 2, Folder 4, Piney Woods Lake Lower Pond Earth Work Calculations-Overburden Removal-Ed Blake, Nov. 1984
85-234 E, Drawer 2, Folder 4, Crosby Arboretum Lake-Earth Work Calculations-51 Contour-Ed Blake, Nov. 1984
85-234 F, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-50 Contour-Ed Blake, Nov. 1984
85-234 G, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-48 Contour-Ed Blake, Nov. 1984
85-234 H, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-46 Contour-Ed Blake, Nov. 1984
85-234 I, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-44 Contour-Ed Blake, Nov. 1984
85-234 J, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-40 Contour-Ed Blake, Nov. 1984
85-235, Drawer 2, Folder 4, North Pond Statistic Sheet, Oct. 1984
85-256, Drawer 2, Folder 4, Spatial Use Diagram-Visitor Pavilion-Ed Blake, July 1985
85-258, Drawer 2, Folder 4, Co-Ordinate Plot-Piney Woods Lake-Ed Blake, July 1985
85-259, Drawer 2, Folder 4, Spatial Structure / Exhibit Circulation Diagram-Ed Blake, 1985
85-262, Drawer 2, Folder 4, Interpretive Journey-Ed Blake, Oct. 1985
85-263, Drawer 2, Folder 4, Interpretive Journey-Ed Blake, Aug. 1985
85-272 A, Drawer 2, Folder 4, Field Layout of Pond Edge / Sheet W-7-Ed Blake and Chris Wells, Fall 1985
85-272 B, Drawer 2, Folder 4, Field Layout of Pond / Slough Edge / Sheet W-7-Ed Blake and Chris Wells
85-272 C, Drawer 2, Folder 4, Field Layout of Northern Slough/ Sheet W-5-Ed Blake and Chris Wells, Fall 1985
85-273. Drawer 2, Folder 5, Sketch Plan for Turn-A-Bout-Ed Blake, Fall 1985
85-274, Drawer 2, Folder 5, Field Study Location for Weir and Pavilion Wing Walls-Ed Blake, Spring 1986
85-275, Drawer 2, Folder 5, Turn Around Survey and Construction-Ed and Chris Wells, Nov. 1985
85-276 A, Drawer 2, Folder 5, Sod Estimate Sheet-Ed Blake, Aug. 1985
85-276 B, Drawer 2, Folder 5, Sod Estimate Sheet-Ed Blake, Aug. 1985
85-276 C, Drawer 2, Folder 5, Sod Estimate Sheet-Sheet W-5-Ed Blake, Aug. 1985
85-277, Drawer 2, Folder 5, Plant Community Notes for Shoreline East of Pavilion-Ed Blake, Fall 1986
85-280, Drawer 2, Folder 5, Possible Plant Associations for Slough and Pond-Ed Blake, Jan. 1986
85-290, Drawer 2, Folder 5, Planting Location of Azaleas given by Bill Giles-Ed Blake, Spring 1985
85-291, Drawer 2, Folder 5, Grading Plan-Piney Woods Lake Crosby Arboretum
85-292, Drawer 2, Folder 5, Preliminary Grading Plan for Southern Portion of Pond-Ed Blake, 1985
85-306, Drawer 2, Folder 5, Lake Photography (Boring for Lake Suggested by Raymond Dearman)-Ed Blake, July 1985
85-307, Drawer 2, Folder 5, Preliminary Layout of the Visitors’ Platform-Ed Blake, 1987
85-309 A, Drawer 2, Folder 5, Preliminary Site Plan Pinecote Pavilion and Visitor Center-Ed Blake, 1985
85-314, Drawer 2, Folder 5, Preliminary Electrical Service Routing-Ed Blake, 1986
85-315, Drawer 2, Folder 5, Directions of Lake Photos Taken Prior to Excavation Beginning-Ed Blake, September 1985
85-316, Drawer 2, Folder 5, Locations of Excavated Holes Dug to Monitor the Ground Water Fluctuation for the Year Preceding Excavation of the Pond and Slough-Ed Blake, Summer 1984
85-317, Drawer 2, Folder 5, Water Fluctuation During Drought Periods-Ed Blake, July 1985
85-323, Drawer 2, Folder 5, Piney Woods lake Photostat reduction of Pond Grading Plan, sheet W6-Ed Blake, 1985
85-339, Drawer 2, Folder 5, Key to Photographic Analysis of Visitor Pavilion and Its Views of Savannah-Ed Blake, 1985
85-342 A, Drawer 2, Folder 5, Schematic Plant Community Diagram, May 1985
85-342 B, Drawer 2, Folder 5, Number 1 Study of East-West Siting of Visitor Facilities-Ed Blake, 1985
85-343, Drawer 2, Folder 5, Number 2 study of East-West Siting of Visitor Facilities-Ed Blake, 1985
85-344, Drawer 2, Folder 5, Turn-A-Bout Design Study-Ed Blake, 1985
85-344 A, Drawer 2, Folder 5, Turn-a-Bout Design Study Sketch #1- Ed Blake, 1985 85-344 B, Drawer 2, Folder 5, Turn-a-Bout Design Study Sketch #2- Ed Blake, 1985
85-344 C, Drawer 2, Folder 5, Turn-a-Bout Design Study Sketch #3- Ed Blake, 1985
85-344 D, Drawer 2, Folder 5, Turn-a-Bout Design Study Sketch #4- Ed Blake, 1985
85-348, Drawer 2, Folder 5, Duplicate of Rendered Plan Prepared for “A Story of Man and the Land” Exhibit-Ed Blake, 1985
85-840 A, Drawer 2, Folder 5, Key Map to 1”=20’-0” Drawings, July 1985
85-840 B, Drawer 2, Folder 5, Key Map to 1”=20’-0” Drawings, July 1985
85-341, Drawer 2, Folder 5, Plan for Piney Woods Lake Exhibit-Ed Blake, Fall 1985
85-349, Drawer 2, Folder 5, Duplicate of Rendered Plan Prepared for “A Story of Man and the Land” Exhibit-Ed Blake, 1985
85-350, Drawer 2, Folder 5, Revisions to “A Story of Man and the Land” Exhibit-Ed Blake, 1985
86-1, Drawer 3, Folder 1, Piney Woods Lake-Sketch Alignment of Electrical Easement to Visitors Center and Path Approach to Pavilion-Ed Blake, 1986
86-7, Drawer 3, Folder 1, First Path Loop and Savanna Plant Attractions-Chris Wells, 1984
86-24, Drawer 3, Folder 1, Crosby Arboretum Visitors Center-Bridge Edge, March 1986
86-32, Dwawer 3, Folder 1, Crosby Arboretum Visitors Center-Fay Jones and Maurice Jennings Architects, Aug. 1986
86-34, Drawer 3, Folder 1, Crosby Arboretum Visitors Center-Maintenance Facility-Fay Jones and Maurice Jennings Architects, Aug. 1986
86-109, Drawer 3, Folder 1, Crosby Arboretum Visitors Center-Maintenance Facility-Fay Jones and Maurice Jennings Architects, Aug. 1986
86-116, Drawer 3, Folder 1, Crosby Arboretum Visitors Center-West and South Elevation-Fay Jones and Maurice Jennings Architects, Aug. 1986
86-217, Drawer 3, Folder 1, Pinecote Plant Community Diagram with Age Structure-Ed Blake, 1986
86-279, Drawer 3, Folder 1, Concepts for Viewing Platforms Along Pond Journey-Ed Blake, Jan. 1986
86-312, Drawer 3, Folder 1, Unfinished 50’ Scale Base Map-Parking and Arrival Journey-Ed Blake
86-317, Drawer 3, Folder 1, Concepts for Viewing Platforms Along Pond Journey-Ed Blake, Jan. 1986
86-317 A, Drawer 3, Folder 1, Concepts for Viewing Platforms Along Pond Journey-Ed Blake, Jan 1986
86-318, Drawer 3, Folder 1, Restoration Center Tree Survey and Visitor Parking and Annual Journey Tree Locations Added in 1987-Ed Blake, 1986
86-320, Drawer 3, Folder 1, Parking and Burn Plot Survey-Ed Blake, 1987
86-324, Drawer 3, Folder 1, Savanna Spatial Study Adjacent Lake Shore-Ed Blake, 1986
86-282 A, Drawer 3, Folder 1, First Attempts at Establishing Locations of Slough Bridges and Routing of Underground Electrical Conduit from Slough to Turn-A-Bout-Ed Blake
86-282 B, Drawer 3, Folder 1, Southeast Corner of Pond-First Lake and Pavilion Columns-Ed Blake, Feb. 1986
86-284, Drawer 3, Folder 1, Field Survey for As. Built Pond Journey-West and South Pond Shore-Ed Blake, 1988
86-288, Drawer 3, Folder 1, Schematic Plan for Rebecca’s Trailer-Ed Blake, Fall 1986
86-289, Drawer 3, Folder 1, Planting Concepts-Site Visiting With Robert R.-Pine Bundles Litter on Lake Bed, March 1986
87-11 A, Drawer 3, Folder 2 Path Corridor Displays-Introductory Concepts for Arrival Journey and Parking-Ed Blake, Jan. 1987
87-58, Drawer 3, Folder 2, Crosby Arboretum Visitors Center-Entry, Oct. 1987
87-59, Drawer 3, Folder 2, Crosby Arboretum Visitors Center (Site Plan of Entry Parking, Elevation of Light Fixture, Gate Support Brace), April 1987
87-60, Drawer 3, Folder 2, Crosby Arboretum Visitors Center-Entrance and Exit Plans-Fay Jones and Associates Architects, May 1987
87-66, Drawer 3, Folder 2, Crosby Arboretum Visitors Center-Fay Jones and Associates Architects, March 1987
87-88, Drawer 3, Folder 2, Crosby Arboretum Visitors Center-Entry-Fay Jones and Associates Architects, May 1987
87-204, Drawer 3, Folder 2, Original Contour Map Used for the 1981 Schematic Plans-Ed Blake, 1981
87-212, Drawer 3, Folder 2, Program Diagram for a Maintenance Facility-Ed Blake, 1985
87-214, Drawer 3, Folder 2, Plan Sketch of Vegetative Patterns-Piney Woods Lake South Pond-Ed Blake, 1984
87-215, Drawer 3, Folder 2, Plantings Adjacent Emergent Cove Bridge, Jan. 1988
87-232 A, Drawer 3, Folder 2, North Entrance Gates Lay-Out the Crosby Arboretum Sketch #1-Ed Blake, Dec. 1987
87-232 B, Drawer 3, Folder 2, North Entrance Gates Lay-Out the Crosby Arboretum Sketch #2-Ed Blake, Dec. 1987
87-232 C, Drawer 3, Folder 2, North Entrance Gates Lay-Out the Crosby Arboretum Sketch #3-Ed Blake, 1987
87-281, Drawer 3, Folder 2, Schematic Lay-Out of North Peninsula Landing-Ed Blake, 1986
87-285 A, Drawer 3, Folder 2, As Built Plans and Future Gate Location-Arboretum Entrance, Parking, Arrival Journey, Dec. 1987
87-285 B, Drawer 3, Folder 2, As Built Lay-Out Plan and Future Gate Location-Arboretum Entrance, Parking, Arrival Journey-Ed Blake, Dec. 1987
87-285 C, Drawer 3, Folder 2, Layout Plan-Ed Blake, June 1987
87-285 D, Drawer 3, Folder 2, Lay-Out Plan-Arboretum Entrance, Parking, Arrival Journey, July 1987
87-285 E, Drawer 3, Folder 2, Material Estimates / Sheet E5 Visitor Parking-Ed Blake, Fall 1987
87-285 F, Drawer 3, Folder 2, Material Estimates / Sheet E6 Visitor Parking-Ed Blake, Fall 1987
87-285 G, Drawer 3, Folder 2, Field Change in Parking Alignment-Ed Blake, July 1987
87-285 H, Drawer 3, Folder 2, Field Work-Sheet e5-Visitor Parking-Ed Blake, Oct. 1987
87-285 I, Drawer 3, Folder 2, Field Work Sheet E-6 As Built Survey of Parking Exit-Ed Blake and Dr. Rung, Dec. 1987
87-285 J, Drawer 3, Folder 2, Field Work for As-Built-Survey Sheet E5 Visitor Parking-Ed Blake and C.Z. Tang, Jan. 1988
87-285 K, Drawer 3, Folder 2, Field Work for As-Built Survey Sheet E5-Ed Blake and C.Z. Tang, Jan. 1988
87-285 L, Drawer 3, Folder 2, Lay-Out Plan Arboretum Entrance, Parking, Arrival Journey, June 1987
87-290, Drawer 3, Folder 2, Sketch #1 Sketch of Visitor Center Adjacent Parking-Ed Blake, 1989
87-322 A, Drawer 3, Folder 2, Survey for Arrival Journey and Parking-Ed Blake, Jan. 1987
78-322 B, Drawer 3, Folder 2, Tree Survey for Parking and Intro Path-Chris Wells and Ed Blake, Jan. 1987
87-322 C, Drawer 3, Folder 2, Preliminary Alignment of Firebreak Separating Arrival Journey Woodland Peninsula from the Savanna, 1987
87-322 D, Drawer 3, Folder 2, Planting Schematic Study Trees at Pond’s Edge to Show Down Filling in of Shallows-Ed Blake, 1988
87-322 E, Drawer 3, Folder 2, Survey for Arrival Journey and Parking-Ed Blake, Jan. 1987
87-322 F, Drawer 3, Folder 2, Site Plan-Piney Woods Lake-Ed Blake, 1987
87-323, Drawer 3, Folder 2, Site Plan-Piney Woods Lake-Ed Blake, 1987
87-324 A, Drawer 3, Folder 2, Pond Design with Chris Wells and Jack Herring, Oct. 1987
87-324, Drawer 3, Folder 2, Pond Design Ideas with Chris and Jack Herrings-Ed Blake, Oct. 1987
87-325 A, Drawer 3, Folder 2, Plant Community Concept Diagram-Carol Franklin, Dec. 1987
87-325 B, Drawer 3, Folder 2, Pinecote Habitat Diagram Comparison to the Natural Areas-Ed Blake, Dec. 1987
87-328, Drawer 3, Folder 2, Plant Community Concept Diagram, Dec. 1987
87-342, Drawer 3, Folder 2, Drainage Observations During a Very Prolonged Storm-Ed Blake, Feb. 1988
87-343, Drawer 3, Folder 2, Savanna Spatial Plan-Rain Check-Ed Blake, Feb. 1988
87-344, Drawer 3, Folder 2, Savanna Spatial Plan-Ed Blake, Oct. 1987
87-345, Drawer 3, Folder 2, Savanna Exhibit Design-Ed Blake, Oct. 1987
87-346, Drawer 3, Folder 2, Curriculum Concepts for Pinecote-Charlie and Ed Blake, Feb. 1987
87-347, Drawer 3, Folder 2, Pinecote Woodland Succession Time Diagram-Ed Blake, 1987
87-348, Drawer 3, Folder 2, Applied Journey Sequence Along Slough-Ed Blake, 1987
87-348 A, Drawer 3, Folder 2, South Savanna Spatial Study Sketch #1-Ed Blake, 1987
87-348 B, Drawer 3, Folder 2, South Savanna Spatial Study Sketch #2-Ed Blake, 1987
87-348 C, Drawer 3, Folder 2, South Savanna Spatial Study Sketch #3-Ed Blake, 1987
88-1, Drawer 3, Folder 3, Design Water-Plant Planting in the Pond of Pinecote-C.Z. Tang, Feb. 1988
88-54, Drawer 3, Folder 3, Crosby Arboretum Visitors Center-(Site Plan, Elevation, Support Brace)-Fay Jones and Maurice Jennings Architects, Jan. 1988
88-87, Drawer 3, Folder 3, Crosby Arboretum Visitors Center-Elevation-Fay Jones and Maurice Jennings Architects, Dec. 1988
88-216, Drawer 3, Folder 3, Planting Design of the Peninsula and Nearby Pond Site-C.Z. Tang, Jan. 1988
88-221 A, Drawer 3, Folder 3, Tree Survey North of Pavilion-Instrument Set-Up-Ed Blake, Dec. 1988
88-221 B, Drawer 3, Folder 3, Turnabout Survey-Ed Blake Dec. 1988
88-231 A, Drawer 3, Folder 3, The Crosby Arboretum Restroom-Ed Blake, Dec. 1988
88-231 B, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-231 C, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-231 D, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-231 E, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-260, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-286, Drawer 3, Folder 3, The Native Plant Center of the Crosby Arboretum-Ed Blake, July 1988
88-287, Drawer 3, Folder 3, Arrival Journey Survey-Ed Blake, Sept. 1988
88-326, Drawer 3, Folder 3, Drainage Observations During Long Duration Storm-Ed Blake, Feb. 1988
88-343, Drawer 3, Folder 3, Master Plan-Pinecote-The Native Plant Center of the Crosby Arboretum
88-345, Drawer 3, Folder 3, Geometry of Land Across Ridge Road from Visitor Parking Dry Enough for a Temporary Visitors Center-Ed Blake, Spring 1990
88-346, Drawer 3, Folder 3, Native Plant Center of the Crosby Arboretum-As Built Savanna Corridor Map Surveyed from Existing Grid-Ed Blake, July 1988
88-347, Drawer 3, Folder 3, Native Plant Center of the Crosby Arboretum–As Built Savanna Corridor Map Surveyed from Existing Grid-Ed Blake, Aug. 1988
88-900, Drawer 3, Folder 3, Past Year Accomplishments-Board Meeting -Ed Blake, April 1988
88-901, Drawer 3, Folder 3, List of Needs-Board Meeting-Ed Blake, April 1988
88-902, Drawer 3, Folder 3, Year Priorities-Board Meeting-Ed Blake, April 1988
89-1, Drawer 3, Folder 4, Unidentified Blueprint, Oct. 1989
89-2, Drawer 3, Folder 4, Field Notes Map of Woodland Moisture Gradient Footprint-Ed Blake, Winter 1989
89-71, Drawer 3, Folder 4, Crosby Arboretum Visitors Center-Fay Jones and Maurice Jennings Architects, March 1989
89-72, Drawer 3, Folder 4, Crosby Arboretum Visitors Center-Fay Jones and Maurice Jennings Architects, March 1989
89-73, Drawer 3, Folder 4, Crosby Arboretum Visitors Center-Fay Jones and Maurice Jennings Architects, March 1989
89-203, Drawer 3, Folder 4, Gum Pond Notes and Burn-No Burn Transitions at Firebreaks-Chris Wells, Sept. 1989
89-264, Drawer 3, Folder 4, Site Plan-Pinecote Native Plant Center-Ed Blake, Dec. 1989
89-270, Drawer 3, Folder 4, Pinecote Native Plant Center-Ed Blake, Jan. 1989
89-278 A, Drawer 3, Folder 4, Grading Plan-Piney Woods Lake-Ed Blake, Aug. 1985
89-278 B, Drawer 3, Folder 4, Grading Plan-Piney Woods Lake-Ed Blake, Aug. 1985
89-292 , Drawer 3, Folder 4, Schematic Site Plan for Pinecote Pavilion Restroom-Ed Blake, Winter 1989
89-293, Drawer 3, Folder 4, Schematic Lighting Plan for Restroom Pathway-Ed Blake, Oct. 1989
89-293 A, Drawer 3, Folder 4, Schematic Lighting Plan for Restroom Pathway-Ed Blake, Oct. 1989
89-294, Drawer 3, Folder 4, Field Work with Staking and Directory-Ed Blake, May 1989
89-344, Drawer 3, Folder 4, Moisture Gradient Fieldwork Map - Ed Blake, Feb. 1989
89-345, Drawer 3, Folder 4, Test Sample for Portraying Plan of Moisture Gradient Field Work-Ed Blake, Fall 1989
89-346, Drawer 3, Folder 4, Visual Analysis for Siting Gum Pond Pavilion-Ed Blake, Oct. 1989
89-347, Drawer 3, Folder 4, Savanna Field Mapping-Pavilion Locations-Ed Blake, Oct. 1989
89-349, Drawer 3, Folder 4, Xerox Vellon Duplicate of Original Pinecote Master Plan Base Map-Ed Blake, 1989
89-350, Drawer 3, Folder 4, Xerox Vellon Duplicate of Original Pinecote Master Plan Base Map-Ed Blake, 1989
90-1, Drawer 4, Folder 1, Planting Plant-Entrance and Parking-Pinecote: Native Plant Center of the Crosby Arboretum-Ed Blake, March 1990
90-2, Drawer 4, Folder 1, Gumpond Map-Plant Locations-Brzuszer, September 1990
90-11, Drawer 4, Folder 1, Pinecote Native Plant Center-The Crosby Arboretum-Ed Blake, January 1990
90-14, Drawer 4, Folder 1, Southwest Corner of the NE1/4 Pearl River County, Miss.
90-23, Drawer 4, Folder 1, Geo Referenced Site Map-Capsis Lab 1990
90-129, Drawer 4, Folder 1, Landscape Lighting Improvements-Larry J. Daughtry, June 1990
90-132, Drawer 4, Folder 1, Grading Plan-Piney Woods Lake-Bob Brzuszer, December 1990
90-134, Drawer 4, Folder 1, Pinecote Pavilion Restroom-Sewage Filter System-Bob Brzuszer, October 1990
90-201, Drawer 4, Folder 1, Circulation and Storage Study-Ed Blake, December 1990
90-202, Drawer 4, Folder 1, Pinecote Operations Center Layout-Bob Brzuszer, December 1990
90-213 A, Drawer 4, Folder 1, Gumpond Schematic Form Study-Ed Blake, January 1990
90-213 B, Drawer 4, Folder 1, Gumpond Form Study with Connection to Wetland Edge-Ed Blake, Jan. 1990
90-213 C, Drawer 4, Folder 1, Gumpond with Pavilion-Ed Blake, Jan. 1990
90-213 D, Drawer 4, Folder 1, Water Flow Diagram-Gumpond-Ed Blake, Jan. 1990
90-213 E, Drawer 4, Folder 1, Gumpond-Diagram-Gumpond Opening with Large Savannah Wetland-Ed Blake, January 1990
90-220 A, Drawer 4, Folder 1, Visitors Center/Pinecote Pavilion/Hammock Pavilion Design Connections-Ed Blake, April 1990
90-220 B, Drawer 4, Folder 1, Hammock Pavilion and Loop-Ed Blake, April 1990
90-222 A, Drawer 4, Folder 1, Design Study-Wetland Edge Adjacent Pitcher Plant Bog-Ed Blake, April 1990
90-222 B, Drawer 4, Folder 1, Schematic Design-Wetland Edge in Gumpond-Ed Blake, April 1990
90-223 A, Drawer 4, Folder 1, Wetland Edge Schematic Plan-Ed Blake, January 1990
90-224, Drawer 4, Folder 1, Operations Center Layout-Ed Blake, April 1990
90-225, Drawer 4, Folder 1, South Pathway Circulation-Ed Blake, April 1990
90-226, Drawer 4, Folder 1, Expanded Savannah Scheme-Ed Blake, April 1990
90-223 B, Drawer 4, Folder 1, Woodland Edge between Wetland Edge and Savannah-Ed Blake, Jan. 1990
90-234, Drawer 4, Folder 1, Expanded Savannah Scheme-Ed Blake, April 1990
90-235, Drawer 4, Folder 1, First Full Site Scheme-Ed Blake, April 1990
90-236, Drawer 4, Folder 1, Woodland/Wetland/Savannah Scheme-Adding Savannah Woodland Transition Landscape Interpretive Station-Ed Blake, April 1990
90-265, Drawer 4, Folder 1, Five-Year Development Plant-Pinecote Native Plant Center-Ed Blake, May 1990
90-266 A, Drawer 4, Folder 1, Preliminary Master Plan-Pinecote Native Plant Center-Ed Blake, May 1990
90-267, Drawer 4, Folder 1, Schematic Plan #2-Pinecote-Ed Blake, January 1990
90-268, Drawer 4, Folder 1, Schematic Plan #1-Pinecote-Ed Blake, January 1990
90-269, Drawer 4, Folder 1, Southwest Corner of the NE1/4 Pearl River County, Miss.
90-271, Drawer 4, Folder 1, Facilities and Plant Habitat Exhibits Map-Ed Blake, April 1994
90-347, Drawer 4, Folder 1, Savannah and Woodland Conversion-Ed Blake, July 1990
90-349 A, Drawer 4, Folder 1, Preliminary Master Plan-Savannah-Ed Blake, May 1990
90-349 B, Drawer 4, Folder 1, Original Layout Sheet for Visitors Center and Surroundings-Ed Blake, Spring 1990
90-349 C, Drawer 4, Folder 1, Color Patterns of Conversion of Woodland to Savannah and Savannah to Woodland-Ed Blake, Spring 1990
90-350 A, Drawer 4, Folder 1, Facilities and Plant Habitat Exhibit-Pinecote
90-350 B, Drawer 4, Folder 1, Site Plan Used for Digitizing Directory Map-Bob Brzuszer, 1990
90-351, Drawer 4, Folder 1, Burn Management-Ed Blake, July 1990
90-352 A, Drawer 4, Folder 1, Freshwater Wetland Gumpond and Wetland Edge Comparison of Shallows to Deep Water-Ed Blake, 1991
90-352 B, Drawer 4, Folder 1, Carol Franklin’s Comments in Master Plan Made During a Two-Day Site Visit, Spring 1990
90-352 C, Drawer 4, Folder 1, Carol Franklin’s Critique for Savannah Circulation and Wetland Edge Alignment-Ed Blake, Spring 1990
90-352 D, Drawer 4, Folder 1, Carol Franklin’s Thoughts on Circulation Revisions, Switzer Pavilion Siting, and Noise Barrier Siting-Ed Blake, Spring 1990
90-353, Drawer 4, Folder 1, Drainage Patterns-Pinecote Native Plants Center-Ed Blake, January 1990
90-295, Drawer 4, Folder 1, Planting Plan-Entrance and Parking- Pinecote: Native Plant Center of the Crosby Arboretym-Ed Blake, March 1990
90-296, Drawer 4, Folder 1, South Portion of Pinecote-Descriptions of Initial Site Conditions-Ed Blake, Summer 1981
90-297, Drawer 4, Folder 1, Parking Lot Planting-Ed Blake, March 1990
90-355, Drawer 4, Folder 1, Pinecote-Facilities and Plant Habitat Exhibits, 1990
90-360, Drawer 4, Folder 1, Electrical / Telephone Wiring Map-Bob Brzuszek, Sept. 1990
90-400, Drawer 4, Folder 1, Schematic Planting Plan for Entrance and Parking-Pinecote: Native Plant Center at the Crosby Arboretum-Ed Blake, Feb. 1990
91-262, Drawer 4, Folder 2, Drainage Study of Shrub Flat Portion of Savanna-Ed Blake, Feb. 1991
91-263 A, Drawer 4, Folder 2, Building Locations-Ed Blake, March 1991
91-263 B, Drawer 4, Folder 2, Anthropogenic Forest Plant Community Map-Ed Blake, March 1991
91-263 C, Drawer 4, Folder 2, Plant Communities at Pinecote-West and South of Pond-Ed Blake, March 1991
91-263 D, Drawer 4, Folder 2, Map of Savanna Crossings-Pinecote-Ed Blake, March 1991
91-299, Drawer 4, Folder 2, Trailer Evacuation and Fill Operation’s Center Plan-Ed Blake, March 1991
91-300, Drawer 4, Folder 2 Restoration Center Circulation Study-Ed Blake, March 1991
92-2, Drawer 4, Folder 3, Crosby Arboretum Floor Plan-Ed Blake, May 1992
92-4, Drawer 4, Folder 3, Unidentified Floor Plan
92-5, Drawer 4, Folder 3, Site Plan for Administrative / Visitor Center-Ed Blake, May 1992
92-16, Drawer 4, Folder 3, Crosby Arboretum Floor Plan, May 1992
92-18, Drawer 4, Folder 3, Crosby Arboretum Floor Plan, May 1992
92-19, Drawer 4, Folder 3, Elevation, May 1992
92-21, Drawer 4, Folder 3, Elevation , May 1992
92-107, Drawer 4, Folder 3, Grading Plan Piney Woods Lake Crosby Arboretum-Bob Brzuszek, May 1992
93-283 A, Drawer 4, Folder 3, Future Visitor Center and Service Drive-Field Survey of Trees / Sheet W-5-Bob Brzuszek, May 1992
93-283 B, Drawer 4, Folder 3, Future Visitor Center and Service Drive-Field Survey of Trees / Sheet W-6-Bob Brzuszek, May 1992
93-267 A, Drawer 4, Folder 4, Pinecote Moisture Footprint-Ed Blake, Sept. 1993
93-267 B, Drawer 4, Folder 4, Rendering Technique Sample Pinecote Master Plan-Ed Blake, Aug. 1993
93-267 C, Drawer 4, Folder 4, Savanna Plan for Rendering Pinecote Master Plan-Ed Blake, Aug. 1933
93-267 D, Drawer 4, Folder 4, Quick Graphic Study for Master Plan-Ed Blake, Aug. 1933
93-267 E, Drawer 4, Folder 4, Pinecote Master Plan Line Drawing-Ed Blake, Sept. 1993
93-267 F, Drawer 4, Folder 4, Pinecote Master Plan Infrastructure Line Drawing-Ed Blake, Sept. 1993
93-348, Drawer 4, Folder 4, Pinecote Circulation Calculations-Ed Blake, Sprint 1991
93-349, Drawer 4, Folder 4, Master Plan Budget Worksheet-Ed Blake, Sept. 1993
93-354, Drawer 4, Folder 4, Firebrake Flagged-Brzuszek, June 1992
93-417, Drawer 4, Folder 4, Tree Memorial for the Crosby Arboretum, Jan. 1993
2014-1, Drawer 4, Folder 5, Pinecote Restoration, 2014
n.d.-1, Drawer 4, Folder 5, Piney Woods Lake Construction Site Plan
n.d.-2, Drawer 4, Folder 5, Sketch of Arboretum and landscape (birds eye view)
n.d.-3, Drawer 4, Folder 5, Chapel at Camp Tiak-Fay Jones and Maurice Jennings Architects
81-100, Drawer 1, Folder 2, Immediate Vicinity Context Map–Ed Blake, Aug. 1981
81-131, Drawer 1, Folder 2, Development Concept Diagram–Ed Blake, 1981
81-132, Drawer 1, Folder 2, Crosby Arboretum Concept Map–Ed Blake, 1981
81-133, Drawer 1, Folder 2, Plant Grid Map–Ed Blake
81-135, Drawer 1, Folder 2, Picayune, MS. Topographic Map–Ed Blake, 1981
81-200, Drawer 1, Folder 2, Picayune Context Map–Ed Blake, Aug. 1981
81-230, Drawer 1, Folder 2, Crosby Arboretum Concept Map-Ed Blake
81-300, Drawer 1, Folder 2, Regional Context Map–Ed Blake, 1981
81-300 A, Drawer 1, Folder 2, Statistical Plot-Dr. McDaniel’s Vegetation Inventory; Babbitt, 1981
81-300 B, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 C, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 D, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 E, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 F, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-300 G, Drawer 1, Folder 2, Statistical Plot of Dr. McDaniel’s Vegetation Inventory; Pinecote–Tom Babbitt, 1981
81-301, Drawer 1, Folder 2, Pearl River Basin Context Map–Ed Blake, 1981
81-302, Drawer 1, Folder 2, Pearl River Basin Context Map-Base Map Original–Ed Blake, Aug. 1981
81-400, Drawer 1, Folder 2, Sunbelt Context Map–Ed Blake, Aug. 1981
81-901, Drawer 1, Folder 2, Design Program Task Flow-Meeting with Mrs. Gammill–Ed Blake, 2/14/1981
81-902, Drawer 1, Folder 2, Research and Consoli-Date Background Information–Ed Blake, 1981
81-903, Drawer 1, Folder 2, Meeting with Arboretum Foundation Board–Ed Blake, March 14, 1981
81-904, Drawer 1, Folder 2, Gather Facts to Substantiate Philosophy, Purpose, Goals and Objectives–Ed Blake, 1981
81-905, Drawer 1, Folder 2, May 16th Meeting with Arboretum Foundation Board–Ed Blake, 1981
81-906, Drawer 1, Folder 2, Design Program Phase–Ed Blake, 1981
81-907, Drawer 1, Folder 2, Design Plan Phase–Ed Blake, 1981
82-1, Drawer 1, Folder 3, Topographical Survey-Work Print for Digitizing Pinecote Site Plan at Cabsis Lab, LSU–Ed Blake
82-2, Drawer 1, Folder 3, Crosby Arboretum Concept Diagram-Ed Blake, 1982
82-310, Drawer 1, Folder 3, Drainage Survey for Service–Ed Blake, Oct. 1984
82-332, Drawer 1, Folder 3, Existing Site Features, July 1983
83-135, Drawer 1, Folder 4, Screened Mylar Base Map From Original Topographic Survey–Ed Blake, 1983
83-136, Drawer 1, Folder 4, Southeast Corner Field Notes–Tom Babbitt, Fall 1983
83-139, Drawer 1, Folder 4, Savanna Spatial Structure and Crown Cover–Ed Blake, Sept. 1983
83-140, Drawer 1, Folder 4, Fire, Water, Plant Response Patterns–Ed Blake, Sept. 1983
83-145, Drawer 1, Folder 4, Schematic Master Plan of the Crosby Arboretum, Nov. 1983
83-149, Drawer 1, Folder 4, Proposed Circulation
83-151, Drawer 1, Folder 4, Schematic Master Plan of the Crosby Arboretum, Nov. 1983
83-157, Drawer 1, Folder 4, Schematic Master Plan of the Crosby Arboretum-Proposed Path Loop System
83-158, Drawer 1, Folder 4, Schematic Master Plan of the Crosby Arboretum-Wet Flat Pine Savannah, Winter 1984
83-164, Drawer 1, Folder 4, Pinecote Woodland Management–Chris Wells, Fall 1984
83-165, Drawer 1, Folder 4, Sepia Duplicate of Screened Mylar Base–Ed Blake, 1983
83-166, Drawer 1, Folder 4, Sepia Duplicate of Screened Mylar Base–Ed Blake, 1983
83-167, Drawer 1, Folder 4, Screened Mylar Topo Duplicate with Interstate Border–Tom Babbitt, 1983
83-169, Drawer 1, Folder 4, Plot of Sidney McDaniel’s Statistical Vegetation Analysis Indicating Wetness and Dryness–Tom Babbitt, Fall 1983
83-172, Drawer 1, Folder 4, Existing Tree Locations–Tom Babbitt, Aug. 1983
83-174, Drawer 1, Folder 4, Burned / Unburned-Wet Dry Patterns–Ed Blake, Spring 1983
83-175, Drawer 1, Folder 4, Field Notes Following Rains, Sept. 1983
83-176, Drawer 1, Folder 4, Idea Sheet, July 1983
83-177, Drawer 1, Folder 4, Soil Samples Taken by Chris Wells, Summer 1993
83-178, Drawer 1, Folder 5, Field Notes-Ed Blake, July 1983
83-179, Drawer 1, Folder 5, Field Notes-Tom Babbitt, July 1983
83-180, Drawer 1, Folder 5, Field Notes for Locating Service Road, Summer 1984
83-327, Drawer 1, Folder 5, Idea Sheet #2-Pitcher Plant Meadow Edge Treatment / Sculpture Garden / Entrance / Poplar, Sept. 1983
83-237 A, Drawer 1, Folder 5, Schematic Site Study-Path Loops / Design Structures, 1984
83-237 B, Drawer 1, Folder 5, Schematic Habitat Diagrams-Existing Vegetation Complexes-Andropogon Associates and Ed Blake
83-237 C, Drawer 1, Folder 5, Pinecote Schematic Circulation–Andropogon Associates and Ed Blake, 1984
83-237 D, Drawer 1, Folder 5, Pinecote Schematic Moisture Diagram—Andropogon Associates and Ed Blake, 1994
83-237 E, Drawer 1, Folder 5, Water Circulation Diagram-Piney Woods Lake—Andropogon Associates and Ed Blake, 1983
83-237 F, Drawer 1, Folder 5, Pond Configuration and Proposed Habitats—Andropogon Associates and Ed Blake, 1983
83-237 G, Drawer 1, Folder 5, Pond Journey Concepts-Piney Woods Lake—Andropogon Associates and Ed Blake, 1983
83-237 H, Drawer 1, Folder 5, Schematic Contouring Plan-Piney Woods Lake—Andropogon Associates and Ed Blake, 1983
83-237 I, Drawer 1, Folder 5, Diagrammatic Design-Piney Woods Lake—Andropogon Associates and Ed Blake, 1983
83-328, Drawer 1, Folder 5, Tree Canopy-Tom Babbitt, July 1983
83-329, Drawer 1, Folder 5, Pitcher Plant Meadow Edge Treatment/Sculpture Garden/Entrance/Poplars
83-330, Drawer 1, Folder 5, Tree Canopy Survey-Tom Babbitt, Summer 1983
83-377 A, Drawer 1, Folder 5, Planting Plan
83-377 B, Drawer 1, Folder 5, Layout Plan
83-377 C, Drawer 1, Folder 5, Grading Plan
83-377 D, Drawer 1, Folder 5, Construction Details
83-377 E, Drawer 1, Folder 5, Construction Details
84-1, Drawer 2, Folder 1, Existing Site Habitat
84-46, Drawer 2, Folder 1, Crosby Arboretum Visitor Center-Pavilion Plan-Picayune, MS-Faye Jones and Associates Architects
84-47, Drawer 2, Folder 1, Crosby Arboretum Visitor Center-Pavilion-Picayune, MS-Faye Jones and Associates Architects
84-123 ,Drawer 2, Folder 1, Crosby Arboretum Visitor Center- Picayune, MS-Faye Jones and Associates Architects
84-213, Drawer 2, Folder 1, Pinecote Ridge Road Parking-Ed Blake, Jan. 1987
84-227, Drawer 2, Folder 1, First Trail Loop Features, Feb. 1984
84-251 A, Drawer 2, Folder 1, Transverse Alignment Service Road Layout-Piney Woods Lake-Ed Blake, Sept. 1984
84-251 B, Drawer 2, Folder 1, Service Geometrics Service Road Layout-Ed Blake, Sept. 1984
84-251 C, Drawer 2, Folder 1, Curve No. 1 Service Road Layout-Ed Blake, Sept. 1984
84-251 D, Drawer 2, Folder 1, Curve No. 2 Service Road Layout-Ed Blake, Sept. 1984
84-251 E, Drawer 2, Folder 1, Curve No. 3 Service Road Layout-Ed Blake, Sept. 1984
84-251 F, Drawer 2, Folder 1, Curve No. 4 Service Road Layout-Ed Blake, Sept. 1984
84-251 G, Drawer 2, Folder 1, Road Stationing Service Road Layout-Ed Blake, Sept. 1984
84-269, Drawer 2, Folder 1, Site Study of Original Pavilion and Visitor Center Alignment-Ed Blake, Fall 1984
84-270, Drawer 2, Folder 1, Layout Draft Base Map for Pavilion and Visitor Center-Ed Blake, Fall 1984
84-271, Drawer 2, Folder 1, Field Survey of Slough Trees / Sheet W-6-Ed Blake and Chris Wells, Summer 1985
84-298, Drawer 2, Folder 1, Engineering Drawing of Weir Piney Woods Lake at Pinecote Shows and Dearman, Engineres, 1985
84-301 A, Drawer 2, Folder 1, Shoreline of Pond at Pinecote-Ed Blake, Summer 1984
84-301 B, Drawer 2, Folder 1, Pathways and Key Features Around Pond-Ed Blake, Summer 1984
84-301 C, Drawer 2, Folder 1, A Simple Diagrammatic Presentation of the Pond Fitting Into the Context of Habitat-Ed Blake, Summer 1984
84-301 D, Drawer 2, Folder 1, Xepox Rellum Duplicate of Piney Woods Lake Design Studies-Ed Blake, Summer 1984
84-301 E, Drawer 2, Folder 1, Pinecote Xepox Relumm Duplicate of Piney Woods Lake Design Studies-Ed Blake, Summer 1984
84-302 A, Drawer 2, Folder 1, Initial Attempts to Establish the Geometry of the Service Rd. Approachign the Pond Inlet-Ed Blake, Fall 1984
84-302 B, Drawer 2, Folder 1, Crosby Arboretum Pond
84-302 C, Drawer 2, Folder 1, Cleaned Map Indicating the Pond Opening Created with Tractor and Mower-Chris Wells, 1984
84-303 A, Drawer 2, Folder 2, Survey of Trees Around the Pond’s Margin, 1984
84-303 B, Drawer 2, Folder 2, Chris Well’s Survey of Tree Locations Adjacent the Slough-Rec’d Tuesday-Ed Blake, 1984
84-303 C, Drawer 2, Folder 2, Survey of Trees Adjacent Pond and Slough-Chris Wells and Ed Blake, Feb. 1985
84-303 D, Drawer 2, Folder 2, Early Attempt at Waiting Out the Alignment of the Annual Journey to Approach the Pavilion-Ed Blake, Fall 1984
84-304, Drawer 2, Folder 2, Survey Reference Geometry for Slough-Ed Blake, 1984
84-305, Drawer 2, Folder 2, Pond and North Shore Siding of Visitor Buildings-Ed Blake, 1984
84-306, Drawer 2, Folder 2, Pond Foreground, Middle Ground, and Background Zones-Ed Blake, 1984
84-307, Drawer 2, Folder 2, Preliminary Contour Sketch of Pond-Ed Blake, 1985
84-308, Drawer 2, Folder 2, Sketch Revision of Pond Bottom to Resemble Old Channel Patterns-Ed Blake, 1985
84-309, Drawer 2, Folder 2, Pond Survey Transverse-Ed Blake, 1984
84-312, Drawer 2, Folder 2, Sheet W-7 Tree Survey-Ed Blake and Chris Wells, July 1985
84-331, Drawer 2, Folder 2, Crosby Arboretum-First Trail Loop, February 1984
84-331 B, Drawer 2, Folder 2, Crosby Arboretum-First Trail Loop with Past Burn Observations-Ed Blake
84-333, Drawer 2, Folder 2, Piney Woods Lake and First Path Loop-Ed Blake, Fall 1984
84-334 A, Drawer 2, Folder 2, Field Layout of Service Road-Ed Blake, October 1984
84-334 B, Drawer 2, Folder 2, Pattern of Dry Ridges-Ed Blake, Fall 1984
84-334 C, Drawer 2, Folder 2, Savannah Firebreak Map-Tom Babbitt, Summer 1983
84-334 D, Drawer 2, Folder 2, Ed’s Field Notes, Summer 1983
84-335 A, Drawer 2, Folder 2, Evolution in Site Design for Pond and Surroundings-Ed Blake, Fall 1984
84-335 B, Drawer 2, Folder 2, Pond Margin Habitat Concepts-Ed Blake, Fall 1984
84-338, Drawer 2, Folder 2, Site Plan of Crosby Arboretum-Ed Blake, Fall 1984
84-339, Drawer 2, Folder 2, Preliminary Site Design-Ed Blake, Fall 1984
84-340, Drawer 2, Folder 2, Proposed Service Road Alignment and Statistics-Ed Blake, Fall 1984
84-401, Drawer 2, Folder 2, Analysis of Drainage Patterns for Service Road and Piney Woods Lake-Chris Wells, 1984
84-403, Drawer 2, Folder 2, Layout of Service Road, Piney Woods Lake, and First Path Loop-Sepia Duplicate of Original-Ed Blake, 1984
84-404, Drawer 2, Folder 2, Layout of Service Road, Piney Woods Lake, and First Path Loop-Sepia Duplicate of Original-Ed Blake, 1984
84-405, Drawer 2, Folder 2, 3 Misplaced East-West Grid Lines R-S, 2-AA, AA-BB-Ed Blake, 1984
85-2, Drawer 2, Folder 3, Site Plan Study for Pavilion Restroom, Aug. 1988
85-12 A, Drawer 2, Folder 3, Piney Woods Lake-The Crosby Arboretum, July 1985
85-12 B, Drawer 2, Folder 3, Piney Woods Lake-The Crosby Arboretum, 1985-86
85-15, Drawer 2, Folder 3, Pond North Shore Revisions-Ed Blake, Fall 1984
85-35, Drawer 2, Folder 3, Crosby Arboretum Visitors Center-Ed Blake Copy, Aug. 1985
85-38, Drawer 2, Folder 3, Crosby Arboretum Visitors Center-Pavilion Plans, Dec. 1985
85-121, Drawer 2, Folder 3, Crosby Arboretum Visitors Center - Weir Design-Ed Blake, Nov. 1985
85-124, Drawer 2, Folder 4, Crosby Arboretum Visitors Center-Pavilion Design (Site Plan, Foundation Plan, Framing Plan, Floor Plan, Roof Plan, Bracing and Grids, Skylights, Metal Connectors), Aug. 1985
85-127, Drawer 2, Folder 4, Crosby Arboretum Visitors Center-Pavilion Revisions (Site Plan, Foundation Plan, Foundation, Framing Plan, Columns and Beams and Grids, Floor Plan, West and East Elevations, Bracing and Grids and South Elevation, Stripping Layout, Brackets and Connectors, Plan of Weir, Electric Specifications, Grate Frame), Nov. 1985
85-128, Drawer 2, Folder 4, Floor Plan-Ed Blake, Dec. 1985
85-128 A, Drawer 2, Folder 4, Spatial Use Diagram-Visitor Pavilion-Ed Blake, July 1985
85-129 A, Drawer 2, Folder 4, Plan for Changing Alignment of Pinecote Pavilion-Ed Blake, 1985
85-205, Drawer 2, Folder 4, Weir Sketch-Piney Woods Lake at Pinecote-Ed Blake, 1985
85-206, Drawer 2, Folder 4, Piney Woods Lake at Pinecote-Elevation Sketch of Weir-Ed Blake, 1985
85-207, Drawer 2, Folder 4, Piney Woods Lake Pinecote-Weir Sketch and Water Draw Down-Ed Blake, 1985
85-233 A, Drawer 2, Folder 4, Crosby Arboretum Lake / North Pond–Earth Work Calculations-52.5 Contour-Ed Blake, Nov. 1984
85-233 B, Drawer 2, Folder 4, Crosby Arboretum Lake / North Pond Earth Work Calculations-52 Contour-Ed Blake, Nov. 1984
85-233 C, Drawer 2, Folder 4, Crosby Arboretum Lake / North Pond Earth Work Calculations-51 Contour-Ed Blake, Nov. 1984
85-233 D, Drawer 2, Folder 4, Crosby Arboretum Lake / North Pond Earth Work Calculations-50 Contour-Ed Blake, Nov. 1984
85-233 E, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations-Ed Blake, Nov. 1984
85-233 F, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations-50 Contour-Ed Blake, Nov. 1984
85-233 G, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations-51 Contour-Ed Blake, Nov. 1984
85-233 H, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations-52 Contour-Ed Blake, Nov. 1984
85-233 I, Drawer 2, Folder 4, Piney Woods Lake-Upper Slough / Earth Work Calculations–Ed Blake, Nov. 1984
85-234 A, Drawer 2, Folder 4, Piney Woods Lake Lower Pond Earth Work Calculations-42, 44, 46 Contour Excavation-Ed Blake, Nov. 1984
85-234 B, Drawer 2, Folder 4, Piney Woods Lake Lower Pond Earth Work Calculations-48 Contour Excavation-Ed Blake, Nov. 1984
85-234 C, Drawer 2, Folder 4, Piney Woods Lake Lower Pond Earth Work Calculations-50 Contour Excavation-Ed Blake, Nov. 1984
85-234 D, Drawer 2, Folder 4, Piney Woods Lake Lower Pond Earth Work Calculations-Overburden Removal-Ed Blake, Nov. 1984
85-234 E, Drawer 2, Folder 4, Crosby Arboretum Lake-Earth Work Calculations-51 Contour-Ed Blake, Nov. 1984
85-234 F, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-50 Contour-Ed Blake, Nov. 1984
85-234 G, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-48 Contour-Ed Blake, Nov. 1984
85-234 H, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-46 Contour-Ed Blake, Nov. 1984
85-234 I, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-44 Contour-Ed Blake, Nov. 1984
85-234 J, Drawer 2, Folder 4, Crosby Arboretum Lake / South Pond Earth Work Calculations-40 Contour-Ed Blake, Nov. 1984
85-235, Drawer 2, Folder 4, North Pond Statistic Sheet, Oct. 1984
85-256, Drawer 2, Folder 4, Spatial Use Diagram-Visitor Pavilion-Ed Blake, July 1985
85-258, Drawer 2, Folder 4, Co-Ordinate Plot-Piney Woods Lake-Ed Blake, July 1985
85-259, Drawer 2, Folder 4, Spatial Structure / Exhibit Circulation Diagram-Ed Blake, 1985
85-262, Drawer 2, Folder 4, Interpretive Journey-Ed Blake, Oct. 1985
85-263, Drawer 2, Folder 4, Interpretive Journey-Ed Blake, Aug. 1985
85-272 A, Drawer 2, Folder 4, Field Layout of Pond Edge / Sheet W-7-Ed Blake and Chris Wells, Fall 1985
85-272 B, Drawer 2, Folder 4, Field Layout of Pond / Slough Edge / Sheet W-7-Ed Blake and Chris Wells
85-272 C, Drawer 2, Folder 4, Field Layout of Northern Slough/ Sheet W-5-Ed Blake and Chris Wells, Fall 1985
85-273. Drawer 2, Folder 5, Sketch Plan for Turn-A-Bout-Ed Blake, Fall 1985
85-274, Drawer 2, Folder 5, Field Study Location for Weir and Pavilion Wing Walls-Ed Blake, Spring 1986
85-275, Drawer 2, Folder 5, Turn Around Survey and Construction-Ed and Chris Wells, Nov. 1985
85-276 A, Drawer 2, Folder 5, Sod Estimate Sheet-Ed Blake, Aug. 1985
85-276 B, Drawer 2, Folder 5, Sod Estimate Sheet-Ed Blake, Aug. 1985
85-276 C, Drawer 2, Folder 5, Sod Estimate Sheet-Sheet W-5-Ed Blake, Aug. 1985
85-277, Drawer 2, Folder 5, Plant Community Notes for Shoreline East of Pavilion-Ed Blake, Fall 1986
85-280, Drawer 2, Folder 5, Possible Plant Associations for Slough and Pond-Ed Blake, Jan. 1986
85-290, Drawer 2, Folder 5, Planting Location of Azaleas given by Bill Giles-Ed Blake, Spring 1985
85-291, Drawer 2, Folder 5, Grading Plan-Piney Woods Lake Crosby Arboretum
85-292, Drawer 2, Folder 5, Preliminary Grading Plan for Southern Portion of Pond-Ed Blake, 1985
85-306, Drawer 2, Folder 5, Lake Photography (Boring for Lake Suggested by Raymond Dearman)-Ed Blake, July 1985
85-307, Drawer 2, Folder 5, Preliminary Layout of the Visitors’ Platform-Ed Blake, 1987
85-309 A, Drawer 2, Folder 5, Preliminary Site Plan Pinecote Pavilion and Visitor Center-Ed Blake, 1985
85-314, Drawer 2, Folder 5, Preliminary Electrical Service Routing-Ed Blake, 1986
85-315, Drawer 2, Folder 5, Directions of Lake Photos Taken Prior to Excavation Beginning-Ed Blake, September 1985
85-316, Drawer 2, Folder 5, Locations of Excavated Holes Dug to Monitor the Ground Water Fluctuation for the Year Preceding Excavation of the Pond and Slough-Ed Blake, Summer 1984
85-317, Drawer 2, Folder 5, Water Fluctuation During Drought Periods-Ed Blake, July 1985
85-323, Drawer 2, Folder 5, Piney Woods lake Photostat reduction of Pond Grading Plan, sheet W6-Ed Blake, 1985
85-339, Drawer 2, Folder 5, Key to Photographic Analysis of Visitor Pavilion and Its Views of Savannah-Ed Blake, 1985
85-342 A, Drawer 2, Folder 5, Schematic Plant Community Diagram, May 1985
85-342 B, Drawer 2, Folder 5, Number 1 Study of East-West Siting of Visitor Facilities-Ed Blake, 1985
85-343, Drawer 2, Folder 5, Number 2 study of East-West Siting of Visitor Facilities-Ed Blake, 1985
85-344, Drawer 2, Folder 5, Turn-A-Bout Design Study-Ed Blake, 1985
85-344 A, Drawer 2, Folder 5, Turn-a-Bout Design Study Sketch #1- Ed Blake, 1985 85-344 B, Drawer 2, Folder 5, Turn-a-Bout Design Study Sketch #2- Ed Blake, 1985
85-344 C, Drawer 2, Folder 5, Turn-a-Bout Design Study Sketch #3- Ed Blake, 1985
85-344 D, Drawer 2, Folder 5, Turn-a-Bout Design Study Sketch #4- Ed Blake, 1985
85-348, Drawer 2, Folder 5, Duplicate of Rendered Plan Prepared for “A Story of Man and the Land” Exhibit-Ed Blake, 1985
85-840 A, Drawer 2, Folder 5, Key Map to 1”=20’-0” Drawings, July 1985
85-840 B, Drawer 2, Folder 5, Key Map to 1”=20’-0” Drawings, July 1985
85-341, Drawer 2, Folder 5, Plan for Piney Woods Lake Exhibit-Ed Blake, Fall 1985
85-349, Drawer 2, Folder 5, Duplicate of Rendered Plan Prepared for “A Story of Man and the Land” Exhibit-Ed Blake, 1985
85-350, Drawer 2, Folder 5, Revisions to “A Story of Man and the Land” Exhibit-Ed Blake, 1985
86-1, Drawer 3, Folder 1, Piney Woods Lake-Sketch Alignment of Electrical Easement to Visitors Center and Path Approach to Pavilion-Ed Blake, 1986
86-7, Drawer 3, Folder 1, First Path Loop and Savanna Plant Attractions-Chris Wells, 1984
86-24, Drawer 3, Folder 1, Crosby Arboretum Visitors Center-Bridge Edge, March 1986
86-32, Dwawer 3, Folder 1, Crosby Arboretum Visitors Center-Fay Jones and Maurice Jennings Architects, Aug. 1986
86-34, Drawer 3, Folder 1, Crosby Arboretum Visitors Center-Maintenance Facility-Fay Jones and Maurice Jennings Architects, Aug. 1986
86-109, Drawer 3, Folder 1, Crosby Arboretum Visitors Center-Maintenance Facility-Fay Jones and Maurice Jennings Architects, Aug. 1986
86-116, Drawer 3, Folder 1, Crosby Arboretum Visitors Center-West and South Elevation-Fay Jones and Maurice Jennings Architects, Aug. 1986
86-217, Drawer 3, Folder 1, Pinecote Plant Community Diagram with Age Structure-Ed Blake, 1986
86-279, Drawer 3, Folder 1, Concepts for Viewing Platforms Along Pond Journey-Ed Blake, Jan. 1986
86-312, Drawer 3, Folder 1, Unfinished 50’ Scale Base Map-Parking and Arrival Journey-Ed Blake
86-317, Drawer 3, Folder 1, Concepts for Viewing Platforms Along Pond Journey-Ed Blake, Jan. 1986
86-317 A, Drawer 3, Folder 1, Concepts for Viewing Platforms Along Pond Journey-Ed Blake, Jan 1986
86-318, Drawer 3, Folder 1, Restoration Center Tree Survey and Visitor Parking and Annual Journey Tree Locations Added in 1987-Ed Blake, 1986
86-320, Drawer 3, Folder 1, Parking and Burn Plot Survey-Ed Blake, 1987
86-324, Drawer 3, Folder 1, Savanna Spatial Study Adjacent Lake Shore-Ed Blake, 1986
86-282 A, Drawer 3, Folder 1, First Attempts at Establishing Locations of Slough Bridges and Routing of Underground Electrical Conduit from Slough to Turn-A-Bout-Ed Blake
86-282 B, Drawer 3, Folder 1, Southeast Corner of Pond-First Lake and Pavilion Columns-Ed Blake, Feb. 1986
86-284, Drawer 3, Folder 1, Field Survey for As. Built Pond Journey-West and South Pond Shore-Ed Blake, 1988
86-288, Drawer 3, Folder 1, Schematic Plan for Rebecca’s Trailer-Ed Blake, Fall 1986
86-289, Drawer 3, Folder 1, Planting Concepts-Site Visiting With Robert R.-Pine Bundles Litter on Lake Bed, March 1986
87-11 A, Drawer 3, Folder 2 Path Corridor Displays-Introductory Concepts for Arrival Journey and Parking-Ed Blake, Jan. 1987
87-58, Drawer 3, Folder 2, Crosby Arboretum Visitors Center-Entry, Oct. 1987
87-59, Drawer 3, Folder 2, Crosby Arboretum Visitors Center (Site Plan of Entry Parking, Elevation of Light Fixture, Gate Support Brace), April 1987
87-60, Drawer 3, Folder 2, Crosby Arboretum Visitors Center-Entrance and Exit Plans-Fay Jones and Associates Architects, May 1987
87-66, Drawer 3, Folder 2, Crosby Arboretum Visitors Center-Fay Jones and Associates Architects, March 1987
87-88, Drawer 3, Folder 2, Crosby Arboretum Visitors Center-Entry-Fay Jones and Associates Architects, May 1987
87-204, Drawer 3, Folder 2, Original Contour Map Used for the 1981 Schematic Plans-Ed Blake, 1981
87-212, Drawer 3, Folder 2, Program Diagram for a Maintenance Facility-Ed Blake, 1985
87-214, Drawer 3, Folder 2, Plan Sketch of Vegetative Patterns-Piney Woods Lake South Pond-Ed Blake, 1984
87-215, Drawer 3, Folder 2, Plantings Adjacent Emergent Cove Bridge, Jan. 1988
87-232 A, Drawer 3, Folder 2, North Entrance Gates Lay-Out the Crosby Arboretum Sketch #1-Ed Blake, Dec. 1987
87-232 B, Drawer 3, Folder 2, North Entrance Gates Lay-Out the Crosby Arboretum Sketch #2-Ed Blake, Dec. 1987
87-232 C, Drawer 3, Folder 2, North Entrance Gates Lay-Out the Crosby Arboretum Sketch #3-Ed Blake, 1987
87-281, Drawer 3, Folder 2, Schematic Lay-Out of North Peninsula Landing-Ed Blake, 1986
87-285 A, Drawer 3, Folder 2, As Built Plans and Future Gate Location-Arboretum Entrance, Parking, Arrival Journey, Dec. 1987
87-285 B, Drawer 3, Folder 2, As Built Lay-Out Plan and Future Gate Location-Arboretum Entrance, Parking, Arrival Journey-Ed Blake, Dec. 1987
87-285 C, Drawer 3, Folder 2, Layout Plan-Ed Blake, June 1987
87-285 D, Drawer 3, Folder 2, Lay-Out Plan-Arboretum Entrance, Parking, Arrival Journey, July 1987
87-285 E, Drawer 3, Folder 2, Material Estimates / Sheet E5 Visitor Parking-Ed Blake, Fall 1987
87-285 F, Drawer 3, Folder 2, Material Estimates / Sheet E6 Visitor Parking-Ed Blake, Fall 1987
87-285 G, Drawer 3, Folder 2, Field Change in Parking Alignment-Ed Blake, July 1987
87-285 H, Drawer 3, Folder 2, Field Work-Sheet e5-Visitor Parking-Ed Blake, Oct. 1987
87-285 I, Drawer 3, Folder 2, Field Work Sheet E-6 As Built Survey of Parking Exit-Ed Blake and Dr. Rung, Dec. 1987
87-285 J, Drawer 3, Folder 2, Field Work for As-Built-Survey Sheet E5 Visitor Parking-Ed Blake and C.Z. Tang, Jan. 1988
87-285 K, Drawer 3, Folder 2, Field Work for As-Built Survey Sheet E5-Ed Blake and C.Z. Tang, Jan. 1988
87-285 L, Drawer 3, Folder 2, Lay-Out Plan Arboretum Entrance, Parking, Arrival Journey, June 1987
87-290, Drawer 3, Folder 2, Sketch #1 Sketch of Visitor Center Adjacent Parking-Ed Blake, 1989
87-322 A, Drawer 3, Folder 2, Survey for Arrival Journey and Parking-Ed Blake, Jan. 1987
78-322 B, Drawer 3, Folder 2, Tree Survey for Parking and Intro Path-Chris Wells and Ed Blake, Jan. 1987
87-322 C, Drawer 3, Folder 2, Preliminary Alignment of Firebreak Separating Arrival Journey Woodland Peninsula from the Savanna, 1987
87-322 D, Drawer 3, Folder 2, Planting Schematic Study Trees at Pond’s Edge to Show Down Filling in of Shallows-Ed Blake, 1988
87-322 E, Drawer 3, Folder 2, Survey for Arrival Journey and Parking-Ed Blake, Jan. 1987
87-322 F, Drawer 3, Folder 2, Site Plan-Piney Woods Lake-Ed Blake, 1987
87-323, Drawer 3, Folder 2, Site Plan-Piney Woods Lake-Ed Blake, 1987
87-324 A, Drawer 3, Folder 2, Pond Design with Chris Wells and Jack Herring, Oct. 1987
87-324, Drawer 3, Folder 2, Pond Design Ideas with Chris and Jack Herrings-Ed Blake, Oct. 1987
87-325 A, Drawer 3, Folder 2, Plant Community Concept Diagram-Carol Franklin, Dec. 1987
87-325 B, Drawer 3, Folder 2, Pinecote Habitat Diagram Comparison to the Natural Areas-Ed Blake, Dec. 1987
87-328, Drawer 3, Folder 2, Plant Community Concept Diagram, Dec. 1987
87-342, Drawer 3, Folder 2, Drainage Observations During a Very Prolonged Storm-Ed Blake, Feb. 1988
87-343, Drawer 3, Folder 2, Savanna Spatial Plan-Rain Check-Ed Blake, Feb. 1988
87-344, Drawer 3, Folder 2, Savanna Spatial Plan-Ed Blake, Oct. 1987
87-345, Drawer 3, Folder 2, Savanna Exhibit Design-Ed Blake, Oct. 1987
87-346, Drawer 3, Folder 2, Curriculum Concepts for Pinecote-Charlie and Ed Blake, Feb. 1987
87-347, Drawer 3, Folder 2, Pinecote Woodland Succession Time Diagram-Ed Blake, 1987
87-348, Drawer 3, Folder 2, Applied Journey Sequence Along Slough-Ed Blake, 1987
87-348 A, Drawer 3, Folder 2, South Savanna Spatial Study Sketch #1-Ed Blake, 1987
87-348 B, Drawer 3, Folder 2, South Savanna Spatial Study Sketch #2-Ed Blake, 1987
87-348 C, Drawer 3, Folder 2, South Savanna Spatial Study Sketch #3-Ed Blake, 1987
88-1, Drawer 3, Folder 3, Design Water-Plant Planting in the Pond of Pinecote-C.Z. Tang, Feb. 1988
88-54, Drawer 3, Folder 3, Crosby Arboretum Visitors Center-(Site Plan, Elevation, Support Brace)-Fay Jones and Maurice Jennings Architects, Jan. 1988
88-87, Drawer 3, Folder 3, Crosby Arboretum Visitors Center-Elevation-Fay Jones and Maurice Jennings Architects, Dec. 1988
88-216, Drawer 3, Folder 3, Planting Design of the Peninsula and Nearby Pond Site-C.Z. Tang, Jan. 1988
88-221 A, Drawer 3, Folder 3, Tree Survey North of Pavilion-Instrument Set-Up-Ed Blake, Dec. 1988
88-221 B, Drawer 3, Folder 3, Turnabout Survey-Ed Blake Dec. 1988
88-231 A, Drawer 3, Folder 3, The Crosby Arboretum Restroom-Ed Blake, Dec. 1988
88-231 B, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-231 C, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-231 D, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-231 E, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-260, Drawer 3, Folder 3, The Crosby Arboretum Restroom Loop-Ed Blake, Dec. 1988
88-286, Drawer 3, Folder 3, The Native Plant Center of the Crosby Arboretum-Ed Blake, July 1988
88-287, Drawer 3, Folder 3, Arrival Journey Survey-Ed Blake, Sept. 1988
88-326, Drawer 3, Folder 3, Drainage Observations During Long Duration Storm-Ed Blake, Feb. 1988
88-343, Drawer 3, Folder 3, Master Plan-Pinecote-The Native Plant Center of the Crosby Arboretum
88-345, Drawer 3, Folder 3, Geometry of Land Across Ridge Road from Visitor Parking Dry Enough for a Temporary Visitors Center-Ed Blake, Spring 1990
88-346, Drawer 3, Folder 3, Native Plant Center of the Crosby Arboretum-As Built Savanna Corridor Map Surveyed from Existing Grid-Ed Blake, July 1988
88-347, Drawer 3, Folder 3, Native Plant Center of the Crosby Arboretum–As Built Savanna Corridor Map Surveyed from Existing Grid-Ed Blake, Aug. 1988
88-900, Drawer 3, Folder 3, Past Year Accomplishments-Board Meeting -Ed Blake, April 1988
88-901, Drawer 3, Folder 3, List of Needs-Board Meeting-Ed Blake, April 1988
88-902, Drawer 3, Folder 3, Year Priorities-Board Meeting-Ed Blake, April 1988
89-1, Drawer 3, Folder 4, Unidentified Blueprint, Oct. 1989
89-2, Drawer 3, Folder 4, Field Notes Map of Woodland Moisture Gradient Footprint-Ed Blake, Winter 1989
89-71, Drawer 3, Folder 4, Crosby Arboretum Visitors Center-Fay Jones and Maurice Jennings Architects, March 1989
89-72, Drawer 3, Folder 4, Crosby Arboretum Visitors Center-Fay Jones and Maurice Jennings Architects, March 1989
89-73, Drawer 3, Folder 4, Crosby Arboretum Visitors Center-Fay Jones and Maurice Jennings Architects, March 1989
89-203, Drawer 3, Folder 4, Gum Pond Notes and Burn-No Burn Transitions at Firebreaks-Chris Wells, Sept. 1989
89-264, Drawer 3, Folder 4, Site Plan-Pinecote Native Plant Center-Ed Blake, Dec. 1989
89-270, Drawer 3, Folder 4, Pinecote Native Plant Center-Ed Blake, Jan. 1989
89-278 A, Drawer 3, Folder 4, Grading Plan-Piney Woods Lake-Ed Blake, Aug. 1985
89-278 B, Drawer 3, Folder 4, Grading Plan-Piney Woods Lake-Ed Blake, Aug. 1985
89-292 , Drawer 3, Folder 4, Schematic Site Plan for Pinecote Pavilion Restroom-Ed Blake, Winter 1989
89-293, Drawer 3, Folder 4, Schematic Lighting Plan for Restroom Pathway-Ed Blake, Oct. 1989
89-293 A, Drawer 3, Folder 4, Schematic Lighting Plan for Restroom Pathway-Ed Blake, Oct. 1989
89-294, Drawer 3, Folder 4, Field Work with Staking and Directory-Ed Blake, May 1989
89-344, Drawer 3, Folder 4, Moisture Gradient Fieldwork Map - Ed Blake, Feb. 1989
89-345, Drawer 3, Folder 4, Test Sample for Portraying Plan of Moisture Gradient Field Work-Ed Blake, Fall 1989
89-346, Drawer 3, Folder 4, Visual Analysis for Siting Gum Pond Pavilion-Ed Blake, Oct. 1989
89-347, Drawer 3, Folder 4, Savanna Field Mapping-Pavilion Locations-Ed Blake, Oct. 1989
89-349, Drawer 3, Folder 4, Xerox Vellon Duplicate of Original Pinecote Master Plan Base Map-Ed Blake, 1989
89-350, Drawer 3, Folder 4, Xerox Vellon Duplicate of Original Pinecote Master Plan Base Map-Ed Blake, 1989
90-1, Drawer 4, Folder 1, Planting Plant-Entrance and Parking-Pinecote: Native Plant Center of the Crosby Arboretum-Ed Blake, March 1990
90-2, Drawer 4, Folder 1, Gumpond Map-Plant Locations-Brzuszer, September 1990
90-11, Drawer 4, Folder 1, Pinecote Native Plant Center-The Crosby Arboretum-Ed Blake, January 1990
90-14, Drawer 4, Folder 1, Southwest Corner of the NE1/4 Pearl River County, Miss.
90-23, Drawer 4, Folder 1, Geo Referenced Site Map-Capsis Lab 1990
90-129, Drawer 4, Folder 1, Landscape Lighting Improvements-Larry J. Daughtry, June 1990
90-132, Drawer 4, Folder 1, Grading Plan-Piney Woods Lake-Bob Brzuszer, December 1990
90-134, Drawer 4, Folder 1, Pinecote Pavilion Restroom-Sewage Filter System-Bob Brzuszer, October 1990
90-201, Drawer 4, Folder 1, Circulation and Storage Study-Ed Blake, December 1990
90-202, Drawer 4, Folder 1, Pinecote Operations Center Layout-Bob Brzuszer, December 1990
90-213 A, Drawer 4, Folder 1, Gumpond Schematic Form Study-Ed Blake, January 1990
90-213 B, Drawer 4, Folder 1, Gumpond Form Study with Connection to Wetland Edge-Ed Blake, Jan. 1990
90-213 C, Drawer 4, Folder 1, Gumpond with Pavilion-Ed Blake, Jan. 1990
90-213 D, Drawer 4, Folder 1, Water Flow Diagram-Gumpond-Ed Blake, Jan. 1990
90-213 E, Drawer 4, Folder 1, Gumpond-Diagram-Gumpond Opening with Large Savannah Wetland-Ed Blake, January 1990
90-220 A, Drawer 4, Folder 1, Visitors Center/Pinecote Pavilion/Hammock Pavilion Design Connections-Ed Blake, April 1990
90-220 B, Drawer 4, Folder 1, Hammock Pavilion and Loop-Ed Blake, April 1990
90-222 A, Drawer 4, Folder 1, Design Study-Wetland Edge Adjacent Pitcher Plant Bog-Ed Blake, April 1990
90-222 B, Drawer 4, Folder 1, Schematic Design-Wetland Edge in Gumpond-Ed Blake, April 1990
90-223 A, Drawer 4, Folder 1, Wetland Edge Schematic Plan-Ed Blake, January 1990
90-224, Drawer 4, Folder 1, Operations Center Layout-Ed Blake, April 1990
90-225, Drawer 4, Folder 1, South Pathway Circulation-Ed Blake, April 1990
90-226, Drawer 4, Folder 1, Expanded Savannah Scheme-Ed Blake, April 1990
90-223 B, Drawer 4, Folder 1, Woodland Edge between Wetland Edge and Savannah-Ed Blake, Jan. 1990
90-234, Drawer 4, Folder 1, Expanded Savannah Scheme-Ed Blake, April 1990
90-235, Drawer 4, Folder 1, First Full Site Scheme-Ed Blake, April 1990
90-236, Drawer 4, Folder 1, Woodland/Wetland/Savannah Scheme-Adding Savannah Woodland Transition Landscape Interpretive Station-Ed Blake, April 1990
90-265, Drawer 4, Folder 1, Five-Year Development Plant-Pinecote Native Plant Center-Ed Blake, May 1990
90-266 A, Drawer 4, Folder 1, Preliminary Master Plan-Pinecote Native Plant Center-Ed Blake, May 1990
90-267, Drawer 4, Folder 1, Schematic Plan #2-Pinecote-Ed Blake, January 1990
90-268, Drawer 4, Folder 1, Schematic Plan #1-Pinecote-Ed Blake, January 1990
90-269, Drawer 4, Folder 1, Southwest Corner of the NE1/4 Pearl River County, Miss.
90-271, Drawer 4, Folder 1, Facilities and Plant Habitat Exhibits Map-Ed Blake, April 1994
90-347, Drawer 4, Folder 1, Savannah and Woodland Conversion-Ed Blake, July 1990
90-349 A, Drawer 4, Folder 1, Preliminary Master Plan-Savannah-Ed Blake, May 1990
90-349 B, Drawer 4, Folder 1, Original Layout Sheet for Visitors Center and Surroundings-Ed Blake, Spring 1990
90-349 C, Drawer 4, Folder 1, Color Patterns of Conversion of Woodland to Savannah and Savannah to Woodland-Ed Blake, Spring 1990
90-350 A, Drawer 4, Folder 1, Facilities and Plant Habitat Exhibit-Pinecote
90-350 B, Drawer 4, Folder 1, Site Plan Used for Digitizing Directory Map-Bob Brzuszer, 1990
90-351, Drawer 4, Folder 1, Burn Management-Ed Blake, July 1990
90-352 A, Drawer 4, Folder 1, Freshwater Wetland Gumpond and Wetland Edge Comparison of Shallows to Deep Water-Ed Blake, 1991
90-352 B, Drawer 4, Folder 1, Carol Franklin’s Comments in Master Plan Made During a Two-Day Site Visit, Spring 1990
90-352 C, Drawer 4, Folder 1, Carol Franklin’s Critique for Savannah Circulation and Wetland Edge Alignment-Ed Blake, Spring 1990
90-352 D, Drawer 4, Folder 1, Carol Franklin’s Thoughts on Circulation Revisions, Switzer Pavilion Siting, and Noise Barrier Siting-Ed Blake, Spring 1990
90-353, Drawer 4, Folder 1, Drainage Patterns-Pinecote Native Plants Center-Ed Blake, January 1990
90-295, Drawer 4, Folder 1, Planting Plan-Entrance and Parking- Pinecote: Native Plant Center of the Crosby Arboretym-Ed Blake, March 1990
90-296, Drawer 4, Folder 1, South Portion of Pinecote-Descriptions of Initial Site Conditions-Ed Blake, Summer 1981
90-297, Drawer 4, Folder 1, Parking Lot Planting-Ed Blake, March 1990
90-355, Drawer 4, Folder 1, Pinecote-Facilities and Plant Habitat Exhibits, 1990
90-360, Drawer 4, Folder 1, Electrical / Telephone Wiring Map-Bob Brzuszek, Sept. 1990
90-400, Drawer 4, Folder 1, Schematic Planting Plan for Entrance and Parking-Pinecote: Native Plant Center at the Crosby Arboretum-Ed Blake, Feb. 1990
91-262, Drawer 4, Folder 2, Drainage Study of Shrub Flat Portion of Savanna-Ed Blake, Feb. 1991
91-263 A, Drawer 4, Folder 2, Building Locations-Ed Blake, March 1991
91-263 B, Drawer 4, Folder 2, Anthropogenic Forest Plant Community Map-Ed Blake, March 1991
91-263 C, Drawer 4, Folder 2, Plant Communities at Pinecote-West and South of Pond-Ed Blake, March 1991
91-263 D, Drawer 4, Folder 2, Map of Savanna Crossings-Pinecote-Ed Blake, March 1991
91-299, Drawer 4, Folder 2, Trailer Evacuation and Fill Operation’s Center Plan-Ed Blake, March 1991
91-300, Drawer 4, Folder 2 Restoration Center Circulation Study-Ed Blake, March 1991
92-2, Drawer 4, Folder 3, Crosby Arboretum Floor Plan-Ed Blake, May 1992
92-4, Drawer 4, Folder 3, Unidentified Floor Plan
92-5, Drawer 4, Folder 3, Site Plan for Administrative / Visitor Center-Ed Blake, May 1992
92-16, Drawer 4, Folder 3, Crosby Arboretum Floor Plan, May 1992
92-18, Drawer 4, Folder 3, Crosby Arboretum Floor Plan, May 1992
92-19, Drawer 4, Folder 3, Elevation, May 1992
92-21, Drawer 4, Folder 3, Elevation , May 1992
92-107, Drawer 4, Folder 3, Grading Plan Piney Woods Lake Crosby Arboretum-Bob Brzuszek, May 1992
93-283 A, Drawer 4, Folder 3, Future Visitor Center and Service Drive-Field Survey of Trees / Sheet W-5-Bob Brzuszek, May 1992
93-283 B, Drawer 4, Folder 3, Future Visitor Center and Service Drive-Field Survey of Trees / Sheet W-6-Bob Brzuszek, May 1992
93-267 A, Drawer 4, Folder 4, Pinecote Moisture Footprint-Ed Blake, Sept. 1993
93-267 B, Drawer 4, Folder 4, Rendering Technique Sample Pinecote Master Plan-Ed Blake, Aug. 1993
93-267 C, Drawer 4, Folder 4, Savanna Plan for Rendering Pinecote Master Plan-Ed Blake, Aug. 1933
93-267 D, Drawer 4, Folder 4, Quick Graphic Study for Master Plan-Ed Blake, Aug. 1933
93-267 E, Drawer 4, Folder 4, Pinecote Master Plan Line Drawing-Ed Blake, Sept. 1993
93-267 F, Drawer 4, Folder 4, Pinecote Master Plan Infrastructure Line Drawing-Ed Blake, Sept. 1993
93-348, Drawer 4, Folder 4, Pinecote Circulation Calculations-Ed Blake, Sprint 1991
93-349, Drawer 4, Folder 4, Master Plan Budget Worksheet-Ed Blake, Sept. 1993
93-354, Drawer 4, Folder 4, Firebrake Flagged-Brzuszek, June 1992
93-417, Drawer 4, Folder 4, Tree Memorial for the Crosby Arboretum, Jan. 1993
2014-1, Drawer 4, Folder 5, Pinecote Restoration, 2014
n.d.-1, Drawer 4, Folder 5, Piney Woods Lake Construction Site Plan
n.d.-2, Drawer 4, Folder 5, Sketch of Arboretum and landscape (birds eye view)
n.d.-3, Drawer 4, Folder 5, Chapel at Camp Tiak-Fay Jones and Maurice Jennings Architects
- Title
- Crosby Arboretum Collection
- Status
- In Progress
- Date
- 1-9-2017
- Description rules
- Describing Archives: A Content Standard
- Language of description
- Undetermined
- Script of description
- Code for undetermined script
Repository Details
Part of the University Archives Repository
Contact:
P.O. Box 5408
Mississippi State Mississippi 39762-5408 United States
sp_coll@library.msstate.edu
P.O. Box 5408
Mississippi State Mississippi 39762-5408 United States
sp_coll@library.msstate.edu